Sunday 12 February 2017

Waiting for efficiency testing.

Waiting for efficiency testing.

Innovation isn't always better. We have a lot of wind and cold in Alberta. I would like to see more vertical designs with the generators/motors at the base for ease of maintenance. http://www.georgeretseck.com/verticalwindmill.html
http://www.engineering.com/ElectronicsDesign/ElectronicsDesignArticles/ArticleID/14291/Biomimic-Wind-Turbine-Whats-All-the-Flap-About.aspx

1 comment:

  1. Got that right. VAWT really is good design. Copes better with bursty and shifting winds as well.

    ReplyDelete